Precast Basement Entrance & Egress

 

Basement Entrance 1

You Supply The Wall Opening – We Do The Rest

Footing to grade _______?

Footing to GradeUnitHeightUnit LengthUnit Width (OD)Width (OD)Door HeightPrice with
steel door

steel door
35"-41"43"45"51-1/2"55-1/2"52"$1720
52"-58"60"60"51-1/2"55-1/2"230"$1780
59"-66"68"68"55-1/2"55-1/2"28"$1950
67"-74"76
78"55-1/2"55-1/2"20"$2000
75"-82"84"88"55-1/2"55-1/2"20"$2290
83"-91"93"96"55-1/2"55-1/2"22"$2530
92"-99"101"104"55-1/2"51-1/2"22"$2765
100"-108"111"114 1/2"55-1/2"57"22"$3140
WINDOW WELLONE STANDARD SIZE39" (OD)57" (OD)57" (OD)N/AN/A

How to Order: (refer to the diagram below)

Basement Entrance Ordering Checklist – Online & Interactive!

How to Order PDF Checklist

  1. Determine the height from footer to grade.
  2. Refer to the Basement Entrance chart and select the size to assure the top the unit will be 2″-6″ above the finished grade.

 

Basement Entrance 3

Basement Entrance 4
A perfect dig out for our precast basement entrance!

Job Requirements: (refer to the diagram below)

  1. Width of opening in foundation wall maximum 41″ for all types.
  2. When foundation is backfilled leave minimum work area for Basement Entrance installation as shown.
  3. After Basement Entrance installation you will need to backfill.

Basement Entrance Job Requirements 5Special job requirements for type E and F units:

The Type E and F units are heavier and require special consideration when it comes to the access area needed to install the unit in your yard.  These diagrams seem a bit complicated, do not hesitate to call us so we can walk you through them.

 

Basement Entrance 7

Basement Entrance 6

 

We also have 1, 2 and 3 Riser units that are installed with a 10 Riser Type D unit if we cannot get our Truck close enough to your hole.

 

basement entrance risers 8